Project Planning Software
The planning problem most companies have isn't the plan itself. It's that the plan stops being true within a week and nobody updates it.
The plan is fine. It's the second week that's the problem
Most planning documents are good on the day they're written. Someone gathers the right people, argues through the sequencing, and produces a roadmap that genuinely reflects what the company can do. Then work starts, someone gets pulled onto a client fire, a dependency slips, and the plan quietly stops matching reality. Nobody redraws it, because redrawing it means another meeting, and the meeting doesn't happen until a deadline is missed and everyone needs to know why.
This is not really a planning problem. It's a maintenance problem. A plan is only useful for as long as it stays true, and keeping it true requires someone to notice, in real time, that capacity has shifted or a dependency has moved. That's exactly the kind of low-grade tracking work that gets skipped when things are busy.
ShipSprint's position is that the plan should update itself from the same data the team is already producing, rather than depending on someone remembering to revise a document. Capacity, sequencing and pace all live in the boards people work from day to day, so the picture of what's coming stays current without a planning ritual to maintain it.
None of this replaces the actual work of planning. Someone still has to decide what matters this quarter and in what order. What it removes is the separate, ongoing job of keeping that decision synchronised with reality after the fact, which is usually where planning effort quietly leaks away.
What keeps a plan honest after week one
None of this is a separate planning module bolted onto the board. It's the same system the work runs through.
Boards carry per-column WIP limits, so a plan can't quietly commit a team to more than it can actually run at once. New requests land in a triage inbox rather than someone's inbox, which keeps unplanned work from sneaking in ahead of what was agreed.
Delivery dates are calculated from the team's measured velocity as sprints complete, not from the original estimate. When something shifts, the forecast shifts with it, often weeks before the original date would have quietly become the day everyone found out.
A built-in wiki keeps the reasoning behind a plan next to the plan itself, with page history so you can see what changed and why. Any sentence in it can become a task, so a planning decision doesn't sit in a document disconnected from the board.
The owner command center answers "where are we against what we said" across every team at once, and a digest lands Monday morning without anyone compiling it by hand.
Because hours are logged where the work happens (about five seconds, next to the task just finished), the system knows who's actually stretched thin before a planning conversation needs to guess at it.
ShipSprint connects to Claude and ChatGPT, so someone can ask "what did we commit to shipping in March, and what's actually on track" and get an answer sourced from the live board, not from whoever remembers the meeting.
Planning across departments that don't plan the same way
A company-wide plan usually breaks at the seams between departments, because engineering plans in sprints, marketing plans in campaigns and launch dates, and HR plans in hiring pipelines and onboarding cohorts. Most planning tools force all three into the same rigid structure, which nobody actually uses correctly for long.
ShipSprint gives each of those teams a template and vocabulary suited to how they actually plan, on the same subscription and the same underlying data. Engineering plans sprints and releases; marketing plans campaigns and content calendars; HR plans pipelines and onboarding checklists; operations plans recurring processes and vendor work. The owner doesn't need every team to plan identically to get one honest view of all of it: the command center rolls it up regardless of which template each team is working in.
This matters most at the exact moment a plan is being made, when someone needs to know whether a dependent team has room. A marketing launch date that depends on an engineering release only holds if engineering's board actually reflects engineering's real capacity. Because that capacity comes from the same live boards rather than a separately maintained roadmap slide, the two plans can't drift apart the way they usually do.
The gap between the annual plan and the sprint plan
Most companies plan at two altitudes that barely talk to each other. There's the quarterly or annual plan (the roadmap presented to leadership, with initiatives and rough dates), and there's the sprint-by-sprint plan each team actually works from. The first is aspirational and gets revised rarely; the second is granular and gets revised constantly. The gap between them is where most planning credibility gets lost, because leadership keeps repeating a date that the team-level plan quietly abandoned two sprints ago.
ShipSprint doesn't force those two altitudes into a single view, because they genuinely serve different audiences. But it does mean the quarterly roadmap can be checked against the same underlying forecast the team is working to, rather than maintained as a separate document that nobody reconciles with reality. When a team's velocity trends down, the initiative that depends on that team can be flagged before the quarterly review, not discovered during it.
This is also where the owner command center earns its keep. Instead of someone assembling a cross-team status update by pinging six leads and stitching the answers together, the rollup already reflects each team's actual forecast, current WIP and blocked items. The Monday digest that comes out of it isn't a summary someone wrote from memory of last week's standup. It's generated from what the boards actually recorded.
When the forecast disagrees with the plan
The most useful moment in any planning system is the one where it tells you something you didn't want to hear. A plan that only ever confirms what you already believed isn't adding information, it's just formatting your assumptions. The value of a velocity-based forecast is precisely that it can contradict the plan: it says, based on how this team has actually delivered over the last several sprints, this date is unlikely, regardless of what was agreed in the kickoff.
That disagreement is not a failure of the plan. It's the system doing the one thing a static roadmap slide structurally cannot do: updating itself as new information arrives. What a team does with that signal is still a judgment call: pull in help, cut scope, or renegotiate the date. But that decision gets made with weeks of runway instead of days, because the forecast moves with each completed sprint rather than sitting still until someone manually revisits it.
Teams that adopt this well tend to stop treating the original plan as sacred and start treating the current forecast as the plan. That's a genuine shift in how planning works, not just a new dashboard bolted onto the old process. It's usually the moment a team stops arguing about whose estimate was right and starts just watching the number move.
Who this actually suits
This fits a company that already has more than one team planning work independently (engineering, a client services function, maybe marketing) and is tired of reconciling their separate plans by hand every time leadership asks for a combined view. If you're a single ten-person team with one backlog, a lot of this cross-team machinery won't matter much yet, and the simpler boards alone will do the job.
It also fits better if your planning problem is specifically staleness rather than a lack of structure. Some teams genuinely don't have a plan at all and need to build planning discipline from nothing. That's a process problem software alone won't fix. ShipSprint is built for the more common case: the structure exists, the plan gets made, and it's the upkeep between planning sessions that quietly fails.
What it costs to run planning this way
- Free covers up to 5 users and 2 projects, permanently: enough to plan a first roadmap and see whether the forecasts hold up before committing to anything.
- Team is ₹299 per user per month (₹2,899 per year), for up to 40 users across every department planning in ShipSprint.
- Business is ₹599 per user per month (₹6,499 per year) and adds the delivery forecasts, the owner command center, and unlimited projects: the parts that carry a plan past the first month.
- Every paid plan starts with a 14-day full-access trial on Business, with a sample project preloaded, no card required. See the full breakdown on the pricing page.
Common questions
Not the roadmap itself, the maintenance of it. Most teams keep the high-level roadmap as a narrative, but let ShipSprint hold the sequencing, capacity and dates underneath it, so the slide can be regenerated from something true instead of edited by hand every time something shifts.
ShipSprint plans through boards, capacity and velocity-based forecasts rather than a Gantt-style critical-path engine. For most teams, knowing which team is over capacity and which dates are trending late does the actual job dependency diagrams are meant to do, with far less upkeep.
Both, without needing a handoff. Each team lead plans their own board against their own capacity, and the owner command center gives whoever holds the company-wide plan a single rollup, so ownership doesn't have to concentrate in one person who becomes the bottleneck for every update.
The whole workspace (boards, wiki pages, history) exports as JSON at any time, on any plan. Nothing about the plan is locked in. Details on tenancy, exports and access controls are on the security page.
Yes. ShipSprint connects to Claude and ChatGPT, so a question like "what's the current forecast for the March initiatives" can be asked in plain language and answered from the live boards, rather than requiring someone to open the command center and read it off manually.
Related pages
See it on your own work.
A workspace your whole company will actually use is 60 seconds away. No card, no risk, nothing to install.
14-day full-access trial · sample project included · no card required