Project Analytics Software
ShipSprint's analytics aren't a wall of charts. They're one calculation, run continuously: how fast is this team actually completing work, and what does that say about the dates ahead?
Most "analytics" in project tools is decoration
Open the analytics tab in most project tools and you'll find burndown charts, a pie chart of task status, a bar chart of tickets by assignee: visually busy, and mostly restating what the board already shows in a different shape. None of it tells you whether Thursday's deadline is actually going to hold, which is the only question anyone opened the tab to answer.
ShipSprint takes a narrower view of what analytics should do: turn what a team has actually delivered, sprint after sprint, into a number you can act on before it becomes a problem. That number is velocity, and almost everything on this page is built from it, directly or a step removed.
There's no separate "analytics module" bolted onto the side of the product, collecting different data through a different mechanism. The same board and the same logged hours that run day-to-day work are the entire input. Nothing extra to configure, nothing extra to keep accurate. Teams on ShipSprint tend to check this number instead of asking someone for a status update, once they trust it.
What velocity actually does for you
Not a vanity metric. A working input to a forecast that gets more accurate the longer a team runs on ShipSprint.
Velocity comes from sprints your team actually completed, points or items closed per sprint, not from a planning-poker guess made once at the start of a project and never revisited.
Remaining scope divided by measured velocity gives a realistic finish date, recalculated as each sprint closes, so the forecast tightens as more real data comes in rather than staying fixed to a plan.
Because the forecast updates continuously rather than at a milestone review, a date that's drifting out of reach shows up while there's still time to cut scope, add hands, or reset expectations.
Workload is measured against real availability, approved leave and out-of-office included, so the forecast isn't quietly assuming everyone is at their desk five days a week, every week.
The owner command center shows forecast confidence per project, so "on track" for the company as a whole isn't hiding one team that's three weeks behind and getting quieter about it.
Ask "how confident is the March 30 date for the ledger project" in plain language, through the Claude or ChatGPT connection, and get an answer sourced from live velocity, not a slide from last month.
Why this beats asking someone for an estimate
A human estimate is a guess made once, usually early, usually optimistic, and rarely revisited once the project is under way. By the time it's clearly wrong, revising it in public feels like admitting a failure rather than updating a number. A velocity-based forecast avoids all three problems: it's measured rather than guessed, it updates every sprint rather than sitting fixed, and it gets more reliable the longer the team runs, because it's built from more completed sprints rather than more confident opinions.
It won't catch a surprise that hasn't happened yet: a lost client, a resignation, a scope change nobody's logged. What it does catch reliably is the ordinary, unglamorous way most projects actually slip: a team quietly running a bit slower than the plan assumed, for long enough that the small gap compounds into a missed date nobody saw coming.
The difference between capacity and headcount, made concrete
Two teams with five engineers each look identical on a headcount spreadsheet. If one of them has three people on approved leave for a chunk of the quarter and the other doesn't, their real capacity for that period isn't remotely the same, yet a plan built on headcount alone would treat them as interchangeable. ShipSprint's forecast is built on capacity, not headcount, specifically to avoid that mistake. Leave, part-time arrangements and time already committed elsewhere all factor into what a team can realistically deliver, not just how many names are on the roster.
What "confident" actually means here
A forecast with three completed sprints behind it and a forecast with thirty aren't stated with the same certainty, and ShipSprint doesn't pretend otherwise. Early on, a velocity number reflects a small, noisy sample. A public holiday or two new hires can swing it more than it should. Given a few months of sprints, the noise averages out and the number starts meaning something you can plan around, rather than something you have to mentally discount.
That's a deliberate trade-off: a forecast that's honestly uncertain early is more useful than one dressed up to look precise before the data supports it.
What analytics doesn't try to predict
A velocity-based forecast is a statement about pace, not about scope creep, client changes of mind, or a competitor forcing a pivot mid-quarter. Those events still have to be logged as new or changed work before the forecast can account for them; the math doesn't anticipate a decision nobody's made yet. That's a limitation worth naming plainly rather than glossing over. The forecast is only as current as the backlog it's reading from, which is one more reason boards and hours logging matter as inputs, not just the number at the end.
A worked example
Say a project has 120 points of scope left, and the team has closed an average of 15 points per sprint across its last five sprints. That's eight sprints remaining, and if sprints run two weeks, roughly sixteen weeks to finish. It's a date the forecast can state plainly rather than as a hopeful guess pinned to a launch announcement made months earlier.
If the next sprint closes only 10 points, the forecast doesn't wait for someone to notice the pattern. It recalculates immediately, the finish date moves out, and the change shows up on the command center the same day the sprint closes, not at the next planning meeting, whenever that happens to fall. That's the actual value on offer here: a slipping date gets caught while there are still sprints left to fix it, not on the afternoon before launch when the only options left are bad ones.
What it costs
- Free covers up to 5 users and 2 projects, forever, enough sprints to see whether the forecast is worth trusting before spending anything.
- Team is ₹299 per user per month (₹2,899 per year) for up to 40 users, with boards and time logging that feed the velocity calculation from the start.
- Business is ₹599 per user per month (₹6,499 per year) and unlocks delivery forecasts, scorecards and the owner command center, with unlimited projects and SSO.
- Every paid plan starts with a 14-day full-access trial on Business, a sample project preloaded with sprint history so the forecast has something to show immediately, no card required.
Common questions
A forecast appears after your first completed sprint, but treat the early ones cautiously. Velocity settles down after three or four sprints as the usual noise of a new team and a new tool works itself out of the numbers.
The forecast and velocity trend are the core view, shown plainly rather than dressed up in chart types that don't change the decision at hand. We'd rather ship one number you actually trust than ten you have to interpret before a meeting.
No. There are no screenshots, no keystroke logs and no activity tracking anywhere in ShipSprint. Velocity comes from completed work items and logged hours, outcomes the person themselves recorded, not surveillance of how they got there.
Forecasts, along with scorecards and the owner command center, are on the Business plan. Every trial runs on full Business access for 14 days. See pricing for the full comparison.
It can be nudged short-term the way any self-reported estimate can, but it's checked against actual completed work every sprint, so an inflated number just makes the next forecast miss and gets caught quickly rather than compounding silently.
Velocity and forecasting are built around sprint-based delivery, which fits engineering most naturally. Non-sprint teams still get status, capacity and hours reporting through their own templates, just without a sprint-derived forecast attached to it.