Team Workload Management Software
"Who has room for this?" is a question most tools answer by asking around. ShipSprint answers it from the board and the calendar, right now.
"Busy" and "overloaded" look identical from the outside
Ask a manager who on their team is overloaded and you'll usually get a guess based on who seems stressed in standup. That's not a knock on the manager: workload is genuinely hard to see from outside, because a full calendar and a full board aren't the same thing, and neither tells you whether the work is evenly spread or piled on the two people who never say no.
Workload management, as ShipSprint does it, is about making that visible today, this sprint, this week, rather than forecasting months out. It's the difference between "who has room for one more thing right now" and "will we hit the March deadline," which is a separate question ShipSprint's capacity planning covers.
The two questions get confused constantly because they use similar-sounding words: capacity, load, availability. But they're answered by different data over different time windows. This page is deliberately about the near-term one: the imbalance you can still fix this week, before it becomes next quarter's forecast problem.
There's a reason this matters more than it sounds like it should. Overload rarely announces itself. The person carrying too much is often the last to say so, because saying so feels like admitting they can't keep up. A system that surfaces the imbalance structurally, through a WIP limit or a leave-adjusted number on a dashboard, doesn't require anyone to raise their hand first.
What keeps work from piling on the same people
Four mechanisms working on the same problem from different angles.
A column that's full stops accepting new cards. That's a harder constraint than a manager remembering to check who's overloaded. It stops the overload before it happens rather than flagging it afterward.
New work gets assigned against what a person can actually carry this sprint, not against whoever's free in the org chart or happens to answer first.
Incoming requests sit in one shared place to be assigned deliberately, rather than landing on whoever answers messages fastest and ending up buried under everything else they were already doing.
Workload accounts for approved leave and time out of office, so "at capacity" means actually at capacity, not at capacity minus a week nobody subtracted from the total.
The command center flags who's over capacity across every team, so imbalance shows up before it becomes a missed date someone has to explain after the fact.
Each person sees their own load and scorecard at all times. Nobody finds out they were "overloaded" for the first time in a review, weeks after it stopped being fixable.
What this looks like day to day
For the person doing the work
The "my day" screen shows today's items and nothing competing for attention alongside them. It's a small thing, but it means workload isn't experienced as a spreadsheet someone else keeps: it's the actual screen they work from every morning.
For the manager
Reassigning a card away from someone who's over is a board action, not a negotiation that starts with "hey, are you drowning?" The WIP limit usually catches it before that conversation is even necessary, which is the entire point of setting the limit in the first place.
For hours, specifically
Logging a day's hours takes about five seconds, sitting right next to the task just finished. A workload picture built from hours nobody logged isn't a picture, it's a guess with a chart around it, and guesses are exactly what this is meant to replace.
For a team split across departments
Workload doesn't stop meaning something at the edge of one team's board. The same balancing logic applies whether it's an engineering sprint, an HR hiring pipeline, or a marketing campaign calendar, each running its own template but feeding the same underlying picture of who has room.
What it costs
- Free covers 5 users and 2 projects, forever, enough to try WIP limits and the triage inbox on a real team before committing to anything.
- Team is ₹299/user/month (₹2,899/year) for up to 40 users, with the full board and capacity-aware planning included.
- Business is ₹599/user/month (₹6,499/year) and adds the owner-level over-capacity view and scorecards across every team in the company.
- Every paid plan opens on a 14-day full-access Business trial, sample project preloaded, no card needed to start.
Rebalancing without a spreadsheet
Here's the sequence without ShipSprint: a manager notices someone seems stretched, asks around to confirm it, opens a spreadsheet that's two weeks out of date, manually tallies what's assigned to whom, and then decides what to move. By which point the overload has usually been real for a while.
Here's the sequence with it: a column hits its WIP limit and stops taking new cards, so the imbalance never fully forms in the first place. If it does form anyway (someone picks up something outside the board, an urgent request bypasses normal routing) the over-capacity flag shows on their view and the manager's, both leave-adjusted against real availability, and reassigning is a drag on the board rather than a rebuilt spreadsheet.
The difference isn't that ShipSprint is smarter about workload. It's that the picture is live and shared, so the decision to rebalance happens on the same day the imbalance appears rather than whenever someone next gets around to checking.
It also removes a specific kind of awkwardness from the conversation. Instead of a manager approaching someone to ask if they're overloaded, a question that invites either false reassurance or an uncomfortable admission, the number is already sitting there, agreed on by both sides before the conversation starts. What's left to discuss is what to do about it, not whether it's true. That's the actual habit teams pick up running ShipSprint: rebalancing becomes a board action taken early, not a rescue mission after someone's already burned out.
Over a few sprints, that shift tends to change the shape of a team's workload on its own, not because anyone set out to fix it deliberately, but because the imbalance stops being invisible long enough to accumulate. A WIP limit that used to be routinely exceeded starts holding, simply because the system stops letting it slide the way a person, trying to be helpful, often does.
Common questions
Workload management is about right now: who's over capacity this sprint, and rebalancing before it causes a problem. Capacity planning is forward-looking, using measured velocity to forecast whether a future date is achievable at all.
No. There's no activity tracking, no keystroke logging, no screenshots. Workload comes from board position and hours the person logged themselves: outcomes, not surveillance of how they spend their day.
Yes. Limits are set per column on a board, and each team's boards are their own, so an engineering column and a marketing column don't have to follow the same rule or the same number.
The request sits in the shared triage inbox rather than landing directly on them, so it gets reassigned deliberately instead of quietly becoming one more thing on an already-full plate. See pricing for which plan fits your team size.
Approved leave feeds directly into the workload and capacity figures, so a week booked off adjusts the numbers without a manager having to remember to discount it by hand every time someone's away.
WIP limits and capacity-aware assignment aren't sprint-specific. HR, marketing and operations run their own boards with the same underlying balancing logic, under templates suited to how each of those teams actually works.
Related pages
See it on your own work.
A workspace your whole company will actually use is 60 seconds away. No card, no risk, nothing to install.
14-day full-access trial · sample project included · no card required