LIVERPOOL × SOFTWARE DEVELOPMENT TEAMS

Project Management Software for Software Development Teams in Liverpool

Baltic Triangle studios growing from five people to fifteen can't afford a sprint board that only tells the truth when someone remembers to update it. ShipSprint's gets its status from GitHub instead.

A five-person team notices a stale card faster than a fifty-person one

A Baltic Triangle studio scaling from five engineers to fifteen doesn't have the luxury of a board that quietly drifts from reality. At that size, everyone already half-knows what everyone else is doing, so a card sitting untouched in "in progress" days after the work actually finished doesn't just mislead a report, it undermines the one tool that's supposed to save the team from constantly interrupting each other to ask.

The usual cause isn't laziness, it's that dragging a card is an extra step layered on top of the actual work, and a small studio juggling client and product work at once has no spare attention for extra steps. The burndown chart ends up tracking who had a free minute to update the board, not what shipped.

ShipSprint removes that step rather than asking for more discipline. A branch tied to a card moves the card the moment work starts. A merged pull request closes it. Burndown and cycle-time analytics build themselves from that merge history, so a growing studio's board stays honest without anyone having to spend time keeping it that way.

₹599per user per month on Business, billed in rupees
5users free, forever, on the Free plan
14day full-access trial on Business, no card required
40users max on Team, unlimited on Business
What actually runs the board

Built around merge history, not memory

The same mechanics work whether the team is five people or fifty, so a studio never has to relearn the tool when it grows.

Branches move cards

Open a branch tied to a card and it advances on the board on its own, no drag required from a team with no spare attention to give it.

Merges close cards

A merged pull request closes its card automatically, so "done" on the board matches what actually shipped in the codebase.

Burndown from real history

Burndown and cycle-time analytics are calculated from actual merge history, a real answer when a founder pitches a prospective client.

A WIP-limited backlog

Per-column WIP limits keep a small team honest about how much is genuinely in flight, before it becomes a fifty-person problem.

Forecasts from measured velocity

Delivery forecasts are calculated from the team's own measured pace, so a date at risk shows up weeks before it's due.

A sprint review that doesn't start with "let me check"

A studio pitching a prospective client often wants to show how a past project was actually delivered, on schedule, properly tracked, and a burndown chart that has to be sense-checked against the repo before anyone shows it to a client is a burndown chart nobody trusts enough to use that way. When the board takes its status from GitHub directly, that verification step is gone, and the chart is presentable the moment someone pulls it up.

A built-in wiki keeps decisions next to the work they affect, with page history, so reasoning made in week one doesn't vanish once the founding two are outnumbered by new hires. Any sentence on a wiki page can become a task directly.

ShipSprint is built by Quantuva Technologies Pvt. Ltd., registered in India, and billed in rupees. That's a fact about where the company is based, not a claim about UK offices or local presence.

FAQ

Questions from Liverpool dev teams

Yes, and because it's built from actual merge history rather than manual updates, it's accurate without needing to be double-checked before a pitch. A founder can pull up a real delivery record on demand rather than assembling a status slide specially for the meeting.

Keep reading

Related pages

See it on your own work.

A workspace your whole company will actually use is 60 seconds away. No card, no risk, nothing to install.

14-day full-access trial · sample project included · no card required