Project Updates Software
Ask a team for an update and you get a paragraph written from memory, sometime later. ShipSprint's updates are the work itself changing state: a card moving, a merge closing a task, a blocker flagged.
An "update" shouldn't require someone to stop and write one
In most teams, "give me an update" means: stop what you're doing, remember what happened, summarise it, and send it somewhere. It's a translation step between the work and the record of the work, and translation steps are where things get lost, softened, or simply skipped when the week gets busy and something has to give.
ShipSprint treats an update as something that happens automatically the moment the underlying thing changes: a card crosses a column, a day's hours get logged, a pull request merges. Nobody writes a sentence describing what happened. The change itself is the update, recorded at the moment it's true rather than reconstructed later from memory.
That sounds like a small distinction. In practice it's the difference between status that's a day old at best and status that's current the second you look, and between an update that's exactly as accurate as the person writing it and one that simply can't be otherwise.
The events that move the picture, without a memo
Six things that change status on their own, because the action that causes them already had to happen anyway.
Per-column WIP limits keep the board honest about what's actually in progress, so a card's position is a real signal about capacity, not just a wish about where things should be.
Incoming work goes to a triage inbox instead of someone's personal messages, so it's visible as a pending item to be planned rather than buried in a chat thread nobody reopens.
A five-second log next to the task just finished updates capacity and forecast math immediately, no separate timesheet update required later in the week.
One tap for "I'm blocked" pulls in the right person with context already attached, which is itself a live update to anyone watching that project, not a delayed mention days later.
On Team plans and above, GitHub branches move cards and merged pull requests close them, so engineering status tracks the code as it lands instead of trailing behind it.
The built-in wiki keeps decisions next to the work they affect, with page history, and any sentence on a page can become a task, turning a note into a tracked update in one step.
The alternative most teams are used to
The usual pattern is a status meeting, or a thread, where each person narrates what they did since the last check-in. It works, in the sense that information does eventually move around, but it's slow, it happens on a fixed schedule regardless of whether anything actually changed, and it depends on everyone remembering to mention the thing that mattered. ShipSprint's updates don't wait for a meeting slot. They exist the instant the underlying change happens, whether that's ten in the morning or the middle of a weekend deploy.
Where those updates surface
None of this is useful if it's buried in a log nobody checks. Individually, updates show up on the "my day" screen each person opens to: their own items, current as of right now, with nothing older cluttering the view. Rolled up across the company, they feed the owner command center and the Monday digest. Rolled up differently, scoped to a single project, they feed a client-shareable status view. Same underlying events, three different destinations, no re-entry required at any point.
Ask the workspace directly, too. Through the Claude or ChatGPT connection, "what changed on the ledger project this week" pulls the same update trail into a plain-language answer.
A single task, followed through
Someone picks up a task from triage and moves it into the active column. That's the first update, and it's also the moment work planning treats it as committed rather than pending. Two days later they log ninety minutes against it, next to the card, in about five seconds. On day three they hit a snag and tap "I'm blocked," which pulls in the one teammate who can unblock it, with the card and its history already attached to the message. Day four, unblocked, they merge a pull request that closes the card automatically.
At no point did anyone write "just checking in, how's this going" or "quick update on where we are." The task's own movement told that story completely, and it told it more accurately than a summary written from memory would have. It's a small sequence, but it's the one teams on ShipSprint point to when asked what actually changed about their week: not one big feature, just a lot of small updates nobody had to type.
What doesn't count as an update
Not everything that happens on ShipSprint is treated as a status event. There's no update generated from how long someone had a tab open, how many times they clicked into a task, or whether they were active at their desk, because none of that is tracked in the first place. An update, here, is always tied to something that actually changed about the work: its state, its owner, or a decision made about it.
That restraint is deliberate. A system that logs everything produces a feed nobody can usefully read; one that logs only meaningful state changes stays worth scanning.
How updates feed the forecast
Every one of these events is also an input somewhere else. A finished sprint's worth of card movements becomes the velocity number that drives delivery forecasts. A day's logged hours becomes part of a scorecard and a capacity read. A merged pull request closing a card is what lets engineering status track code instead of guesswork. Updates aren't just a feed to glance at; they're the raw material everything else on the workspace is built from.
What it costs
- Free covers up to 5 users and 2 projects, forever, with board and blocker updates included from the first task.
- Team is ₹299 per user per month (₹2,899 per year) for up to 40 users, and includes the GitHub integration that ties merges to cards.
- Business is ₹599 per user per month (₹6,499 per year), adding the owner command center and Monday digest that roll updates up company-wide.
- Every paid plan starts with a 14-day full-access trial on Business, sample project preloaded, no card required.
Common questions
For most day-to-day status, no, the board, hours and blocker flags carry it. For context a computer can't infer, like why a decision was made, a quick note in the wiki does more good than a status paragraph, and it stays attached to the work permanently instead of getting lost in a chat scroll.
Updates are the underlying events: a card moving, hours logging, a merge closing a task. Notifications are the much smaller set of things ShipSprint actively pushes to you about, which is deliberately just two: a missing-hours nudge and the Monday digest. Most updates you see by looking, not by being told.
Branches move a card automatically, and a merged pull request closes it. That's the core of the connection, available on Team plans and above, so the board and the codebase stay in step without a manual update in either direction.
Yes. HR, marketing and operations run on the same board mechanics with their own templates and vocabulary, so a card moving or hours logging updates their status the same way it does for engineering. See how ShipSprint works across teams.
Wiki pages carry full page history, and board and sprint activity is retained as part of the velocity and forecast record, so past updates aren't discarded once the moment passes.
Moving a card back, or correcting a logged hour, updates the record the same way the original action did. The status reflects the current true state, not a frozen snapshot of a mistake.
Related pages
See it on your own work.
A workspace your whole company will actually use is 60 seconds away. No card, no risk, nothing to install.
14-day full-access trial · sample project included · no card required