Project Scheduling Software
The hard scheduling problem sits across projects: the same three people are quietly scheduled on four different projects at once.
- 14-day full-access trial
- No card required
- 7-day refund on paid plans
Your scheduling problem isn't inside one project
Ask most companies to schedule a single project and they can do it: lay out the tasks, put dates on them, done. The scheduling actually goes wrong at the level above that: the senior designer is booked on the launch, the client redesign, and someone's onboarding, all in the same week, because the three project owners scheduled against her time independently and none of them could see the other two commitments.
That's a visibility problem. Every project's schedule looks reasonable in isolation. It's only once you overlay all of them against the actual people doing the work that you find out the schedule was never realistic to begin with. By the time that shows up, it's usually as a missed date rather than as a warning.
A tool that schedules one project at a time can't fix this, no matter how good its own timeline view is, because the conflict lives in the gap between tools: one project's plan simply has no way to see another project's claim on the same person. Fixing it means the underlying capacity data has to live in one place that every project's schedule draws from, which is a different problem from making any single project's timeline prettier.
ShipSprint keeps each person's load visible across every project they're on rather than letting each project plan in its own bubble, so the conflict can be seen when the schedule is set, not when someone finally admits they're underwater.
What keeps a schedule from quietly overcommitting people
Scheduling here is read straight off the work, with no separate calendar layered on top.
Boards carry per-column WIP limits, so a column shows it when a schedule piles on more than the people running it can move through. If a schedule breaks the limit, that's visible immediately, not discovered three weeks in.
New requests land in a triage inbox instead of someone's messages, so an urgent ask doesn't jump the schedule silently just because it arrived through the loudest channel.
In sprint-based projects (the software development template), burndown and velocity reports show the team's measured pace as sprints complete, and on Team the work monitor flags deadline risk to the assignee and their manager, so a schedule slipping shows up before the date it was promised for, while there's still time to rebalance who's on what. Delivery forecasts are on Business.
Hours are logged against the issue they were spent on, from the issue or from My Work, which means the schedule can be checked against what people actually did, not just what a plan assumed they'd do.
On Team, the manager dashboard shows each direct report's load (open, in progress, overdue, hours this month) across projects. On Business, the owner Command Center answers "where are we?" across every project at once, with a weekly owner digest nobody assembles by hand from five separate boards.
For engineering specifically, a branch named with an issue key moves the issue forward and a merged pull request moves it to Done, so the schedule tracks what the code is actually doing instead of a status someone typed in yesterday. (Team plan and above.)
The person, not the project, is the scheduling constraint
Most scheduling tools are built around the project: lay out its tasks, set its dates, watch its timeline. That works fine right up until a person is on more than one project, which in any company past a handful of people is true almost immediately. The project-level view has no way to see that its schedule depends on someone who is already fully booked two projects over.
In ShipSprint, a person's assignments and time logs add up across projects, so their load is a shared fact rather than something each project owner has to separately guess at. A person's My Work list and monthly capacity ring cover everything assigned to them, not just the slice visible from one board, and on Team the manager dashboard shows each report's load across projects and the work monitor raises an overload alert.
When a sprint is started in a software development project, ShipSprint warns about people who are overcommitted, taking their declared time off into account. That warning comes at the moment the schedule is set, not from an estimate made before the rest of their week was accounted for.
It also changes who needs to be in the room when a schedule gets set. A hand-built schedule usually requires the project owner to separately go ask around about who's free, because that information isn't anywhere a single person can just look it up. When capacity is visible on the board itself, that conversation gets shorter. The constraint is already in front of both people before the negotiation over priority even starts.
When two projects both need the same person this week
The scheduling conflict that actually costs a company money is usually two project owners each scheduling the same specialist for the same week, neither aware of the other's plan, because their schedules live in two different tools, two different spreadsheets, or two different mental models of who's "available." The person in the middle either quietly works nights to cover both, or one project slips and nobody can say exactly why until the retro.
ShipSprint doesn't solve this by adding a resourcing algorithm that assigns people automatically. That tends to produce technically balanced schedules that ignore context a human would catch immediately. It helps by making the conflict visible before anyone commits: a person's current assignments are the same data on every board they appear on, so scheduling them into a fourth thing shows up as pressure on their existing load (in their capacity ring, the sprint-start warning and, on Team, the manager dashboard), not as a fresh, apparently-empty calendar slot.
This is a smaller intervention than it sounds, and that's deliberate. The two project owners still have the conversation about who gets the specialist this week, but they're having it with the same facts in front of both of them, instead of discovering the overlap after one schedule has already slipped. The aim is fewer surprised "wait, you had her too?" moments.
Scheduling around leave, notice periods and the calendar you actually have
A schedule built on an idealised calendar (everyone working full weeks, nobody on leave, no notice periods) is wrong by construction, and it's wrong in the same direction every time: optimistic. Real calendars have festival leave, sick days, someone serving a notice period, and a new hire who won't be productive for their first few weeks. None of that shows up in a schedule built from task estimates alone.
On Team, each person declares their leave, sick days, holidays and other time off as out-of-office, and that feeds capacity, work-monitor alerts and scorecards. There's no built-in public-holiday calendar, so festival days count once people enter them as time off. A team that's short two people to festival leave in October then gets the warning when the sprint starts, because the overcommit check counts that time off, instead of someone having to remember to discount the schedule by hand.
Contractors, client work, and the schedules that live outside a single team
Agencies and consultancies have a version of this problem that's even sharper: the same senior person is billable across three client engagements in the same week, and every hour scheduled against one client is an hour that isn't available for another. Get that wrong and either a deliverable slips or someone quietly works an unsustainable week to cover the gap. The client never sees the internal scramble, they just see whether the date held.
Time is logged against the specific task and project it belongs to, and a person's assignments add up across every client board they're on. WIP limits are advisory and set per column on each board, so they won't track one person's week across boards on their own; what does is the specialist's capacity ring in My Work and, on Team, their load on the manager dashboard. That way each engagement isn't scheduled as if the specialist had a full week free.
Where this matters most is at the proposal stage, well before anyone signs anything: knowing whether a delivery date is actually achievable against the team's current commitments, not just against an idealised availability that assumes nobody else has a claim on the same people.
What it costs
- Free covers up to 5 users and 2 projects, permanently: enough to see whether shared-capacity scheduling actually catches the conflicts your current process misses.
- Team is ₹299 per user per month (₹2,899 per year), up to 40 users, with GitHub sync included for engineering teams.
- Business is ₹599 per user per month (₹6,499 per year) and adds delivery forecasts and the owner Command Center, with portfolio health and capacity across every project in one place.
- A new workspace starts with a 14-day trial of Business features for up to 5 seats, sample project preloaded, no card required, and carries on as Free if nobody upgrades. Full detail on the pricing page.
Common questions
You assign the work. What ShipSprint does is surface the conflict: a column over its WIP limit, a sprint-start warning about an overcommitted person, and on Team a work-monitor alert about deadline risk or overload, so the person scheduling sees it before committing to a date, rather than finding out after.
Yes. Their My Work list pulls together what's next across everything assigned to them, with a monthly capacity ring. Owners can open anyone's My Work, and on Team the manager dashboard shows each direct report's load across projects, which is usually where the double-booking actually gets caught.
Yes, on Team plan and above. A branch named with an issue key moves the issue forward, and "fixes PAY-12" or a merged pull request moves it to Done, so the schedule reflects what's actually merged rather than a manually updated status field that drifts from the repo within a week.
Sprints add velocity, burndown and the overcommit warning for teams that use them, but WIP limits, the triage inbox and cumulative flow with cycle and lead time work the same way for teams running continuous flow. Sprints are part of the software development template only; the HR, marketing, operations and simple kanban templates have them switched off, so a team that wants sprints creates its project from the software template.
On Team, a person's leave goes in as out-of-office time, which feeds capacity, alerts and scorecards, and starting a sprint warns if anyone is overcommitted once that time off is counted. A notice period isn't a separate concept: enter the days the person won't be working as time off, and the velocity reports will show the lower throughput as sprints complete.
Keep reading
See it on your own work.
A workspace your whole company will actually use is 60 seconds away. No card, no risk, nothing to install.