COMPANY SIZE

Project Management for 100-Person Teams

At 100 people, there isn't one project running. There are several, across several teams, at once, and this page is about replacing the meeting that currently tries to hold all of them together.

The recurring meeting that exists to answer one question

Somewhere around a hundred people, most companies have a meeting whose entire purpose is a single sentence: "where's everything." Engineering gives a two-minute update, marketing gives a two-minute update, ops gives a two-minute update, and everyone leaves having spent forty-five minutes to learn four things they could have read in four sentences, if those four sentences had existed anywhere before the meeting started.

The meeting isn't the problem. Building the update the meeting runs on is. Someone on each team spends part of their week turning boards and Slack threads into a status paragraph, and that work gets redone from scratch every single week, because there's nowhere for it to accumulate. At 100 people, running several concurrent projects across several teams, that's not a minor tax. It's a standing weekly cost that scales with headcount and never gets cheaper.

ShipSprint's answer isn't a better meeting. It's removing the reason the meeting exists: a screen that already shows where everything is, so the meeting (if it still happens at all) starts from real numbers instead of building them live.

This is squarely Business-plan territory, not because of the headcount alone but because of what the headcount implies: several concurrent projects, several team leads each with their own status to report, and an owner or founder who's several layers removed from any single board. Team was never built to answer "where are we across everything." It was built to run one team's boards well, which it still does, but that's a narrower job than the one a hundred-person company running multiple projects actually needs done.

Business-plan territory

What a hundred people, running several projects at once, actually needs

At this size these aren't extras. They're the standing infrastructure that replaces a recurring meeting.

One screen instead of a status round

The owner command center pulls "where are we" across every team into a single view, and a digest lands Monday morning already built, so no one spends Sunday night assembling slides for Monday's meeting.

Concurrent projects that don't collide

Boards carry per-column WIP limits so a team can't quietly overload itself while running two or three projects at once, and new requests land in a triage inbox instead of competing for space in someone's messages.

A forecast for each project, not one blended number

Each team's delivery forecast comes from that team's own measured velocity, so when three projects are running in parallel, a slip in one shows up on its own timeline rather than getting averaged away by the other two.

Hours logged without a Friday scramble

Logging a day takes about five seconds and sits next to the task just closed. Across a hundred people running several projects, that's the difference between billable hours arriving on time and someone reconstructing three weeks of timesheets from memory.

A calm daily view per person, not per project

Everyone opens to a "my day" screen regardless of how many projects they're touching: today's items, a one-tap log, one tap to say "I'm blocked" and pull in the right person with context attached.

GitHub-connected engineering analytics

Branches move cards, merged pull requests close them, and burndown and cycle-time analytics run for engineering specifically, useful once there's more than one engineering team to compare.

Replacing the standing meeting, specifically

The cross-team status meeting usually exists because there's no other reliable way to get a rollup. Once the command center and Monday digest exist, the meeting's actual job shrinks to the part that needs humans in a room: deciding what to do about a risk, not reporting that the risk exists. Some teams keep a shorter version of the meeting for exactly that; most find the meeting itself gets smaller once the status-gathering part is no longer happening live. Companies around a hundred people who make this switch often stop calling it "the status meeting" within a quarter. It just becomes the fifteen minutes where the two or three at-risk items actually get discussed.

The digest matters as much as the command center here. A screen that's always current is only useful if someone remembers to look at it; a digest that lands on its own on Monday morning removes that dependency. It shows up whether or not anyone had time to build a status update that week, which is usually the exact week it's most needed.

What "several teams" actually means operationally

A hundred people rarely means one team of a hundred. It usually means five or six teams of fifteen to twenty, each with its own lead, its own cadence, and its own definition of a good week. Engineering might run two-week sprints, marketing might run a monthly campaign calendar, and ops might run a queue with no sprint structure at all. A rollup that forces all of them into the same reporting format tends to distort at least two of the three.

That's why each team's forecast is computed from its own velocity rather than a blended company number: a two-week sprint team and a monthly-cadence team shouldn't be judged against the same curve. The command center is built to show both the aggregate view and the team-by-team detail underneath it, so nobody has to choose between "the big picture" and "the accurate picture."

What it costs

Business runs ₹599 per user per month. For a hundred people: 100 × ₹599 = ₹59,900 a month. On annual billing at ₹6,499 per user per year, that's 100 × ₹6,499 = ₹649,900 a year, roughly ₹54,158 a month.

  • Business is the only plan that fits a hundred seats: Team's ceiling is 40 users
  • Unlimited projects, so running several at once across teams doesn't hit a cap
  • Billing is per seat in rupees with GST-compliant invoices, annual billing available
  • A 14-day full-access trial runs on Business with a sample project loaded and no card required

Full detail is on the pricing page.

Where the digest actually goes on a Monday morning

At a hundred people, the person who wants the Monday digest usually isn't the same person building it. It's an owner, a founder, or a head of operations who needs the picture without spending their own morning assembling it from five separate team leads. The digest is built for that seat specifically: what shipped last week across every team, what's at risk, and where a team is running thin on capacity, delivered without anyone having to chase it down first. Founders who make the switch at this headcount usually describe the same relief: Monday morning stops being the morning they spend on other people's status updates instead of their own priorities.

It also solves a smaller but real problem: the weeks nobody has time to write a proper update are usually the weeks something is actually going wrong, which is exactly when a manually assembled status is least likely to exist. A digest that's generated from the underlying work, rather than typed up by a person, shows up the same way whether it was a calm week or a chaotic one.

FAQ

Common questions

Yes, it's built for exactly that. Each project and team keeps its own forecast and board, and the command center rolls them into one "where are we" view without blending them into a single misleading average.

Keep reading

Related pages

See it on your own work.

A workspace your whole company will actually use is 60 seconds away. No card, no risk, nothing to install.

14-day full-access trial · sample project included · no card required