FEATURE

Productivity Reports Software

A productivity report that measures what shipped, at the level of a team, not a daily score on any one person.

What we mean by "productivity report" (and what we don't)

Ask ten managers for a productivity report and most of them are quietly picturing the same thing: a list of names with a number next to each one, ranking who did more this week. ShipSprint won't build you that list. There's no per-person activity score, no idle-time percentage, no ranking of who typed the most.

What it does report on is throughput: how many items a team actually finished, how long work sits in each stage of a board, and whether the pace this sprint matches the pace three sprints ago. That's a real, useful number. It's just a team number, not a surveillance number about an individual, and it holds up to scrutiny in a way an activity score never quite does, because you can point at the finished cards behind it.

If what you actually need is proof that a specific person is working, this page will disappoint you. If what you need is an honest read on whether a team's output is keeping pace with its commitments, that's exactly what ShipSprint measures, and it does it from records people would keep anyway.

Picture two engineering teams of six. One closes eighteen cards a sprint and has closed roughly that many for the last five sprints running. The other closed twenty-six last sprint but has bounced between nine and twenty-six over the same stretch. A per-person activity score would tell you neither of those things; it would just tell you who was at their desk. Throughput and its trend tell you which team you can actually plan against, which is the question a productivity report is usually standing in for. That's the practical change teams notice after a few sprints on ShipSprint: planning conversations start from a number everyone trusts, instead of from someone's gut feeling about who's been "heads down."

What's in the report

Throughput, not typing

Everything here comes from work leaving a board, not from watching someone work.

Items completed per sprint

A count of cards that moved to done, by team, over time: the raw throughput number most "productivity" conversations are actually reaching for.

Cycle time by stage

How long work sits in each column on average, so a slowdown shows up as "review is taking longer" rather than a vague sense that things feel slower.

Velocity, tracked sprint over sprint

The same measured velocity that feeds delivery forecasts, visible on its own as a trend line rather than buried inside a single date prediction.

Hours, logged in five seconds

Time entries sit next to the task just finished and take about five seconds to file. The reminder for a missing day goes to the person, not their manager, so the log stays theirs.

No idle timer, no keystrokes

No screenshots, no keystroke logging, no activity tracking of any kind. If a report needs that to exist, ShipSprint is the wrong tool for it, deliberately.

A scorecard the person can see

Where individual numbers do appear, in a leave-adjusted scorecard, they're visible to the person they describe, not just to whoever is reviewing them.

Team-level by design, not by limitation

This is a deliberate choice, not a missing feature. A number built by watching individuals gets gamed the moment people notice it's being watched: cursors move, tabs stay open, and the data quietly stops meaning anything. A number built from finished work is harder to fake, because finishing the work is the point anyway.

It also changes who the report serves. A team-level throughput trend is something a manager and a team can look at together and argue about honestly: is the backlog too large, is review the bottleneck, did last sprint's estimate hold up. A ranked list of individual scores tends to produce a very different, much worse conversation, and it produces it in a room the person being ranked isn't in.

Where ShipSprint does put a number on a person, the leave-adjusted scorecard, it's built to be seen by that person first, precisely so a performance conversation never opens with data they've never laid eyes on.

If you came here looking for individual monitoring

Some visitors to this page are specifically looking for activity tracking: screenshots, keystroke counts, an idle-time percentage per employee. It's worth saying plainly that ShipSprint doesn't do that, on purpose, and adding it isn't on a roadmap. The reasoning isn't only ethical, though it starts there. It's also that this kind of data rarely stays useful. People adapt to being watched faster than the watching improves, and what you're left with is a dashboard full of numbers that measure compliance with being observed rather than anything about the work.

What tends to actually answer the underlying worry, "is this team on track, and is everyone pulling their weight," is visible without any of that. A board with WIP limits shows when someone's queue is empty or overflowing. A missing time log shows up as a gap, not a guess. A card untouched for a week is its own signal. None of it requires watching anyone to see it.

There's a second, quieter reason to leave activity tracking out: it changes what people are willing to log honestly. A five-second time entry filed next to a finished task is an easy, low-stakes habit when nothing else about that person's screen is being recorded. Add an idle timer to the same workspace and the incentive flips. People start managing the timer instead of the work, and the very data you were hoping to make more accurate gets less trustworthy instead.

Where the numbers live

None of this sits behind a separate reporting module you have to configure. It's built from the same board and time-log data every team already produces, which is the whole point: a report you don't have to build is a report that actually gets read. Here's where it surfaces, at three levels:

  • Throughput and cycle time roll up into the manager view for each team, and further into the owner command center across every team in the company.
  • A digest lands Monday morning summarising the week's movement, without anyone assembling it by hand.
  • Because ShipSprint connects to Claude and ChatGPT, you can ask "how many items did engineering close last sprint" in plain language and get an answer from live data.
  • Every department, engineering, HR, marketing, operations, reports on this same throughput logic with its own templates, so the numbers stay comparable in kind even when the work itself looks nothing alike.
FAQ

Common questions

No, and that's intentional. There's no screenshot capture, no keystroke logging, and no activity score assigned to a person. What gets measured is team throughput (items finished, cycle time, velocity) plus a leave-adjusted scorecard that the person it describes can also see.

Keep reading

Related pages

See it on your own work.

A workspace your whole company will actually use is 60 seconds away. No card, no risk, nothing to install.

14-day full-access trial · sample project included · no card required