FREE TOOL

Delivery Date Forecaster

Estimate when the remaining work will be done from how fast your team has actually been finishing, with a likely date and an honest range around it. Free, no sign-up, and nothing you type leaves your browser.

Your work

Separate with commas. Three to six sprints is plenty.

Forecast

-likely finish, at your average pace
-earliest, at your fastest recent sprint
-latest, at your slowest recent sprint
6sprints at an average of 20 a sprint

Results update as you type. Nothing is stored or sent.

Try it with your own teamEvery plan starts with 14 days of the full Business plan, a sample project loaded and no card needed.
Start free trial

How the forecast works

The forecast uses what your team has actually finished, not what it planned. It takes the average of your recent sprints and asks how many sprints of that pace the remaining work needs:

Sprints needed = work remaining ÷ average finished per sprint, rounded up

Likely finish = start date + sprints needed × sprint length

A single date hides how uncertain it is, so the same sum is run at your fastest and slowest recent sprint. The gap between the earliest and latest dates is the honest range to share, and a wide gap is itself useful news: the team's pace is unsteady, and the date will be too.

A worked example

A team has 120 points left and finished 21, 18, 24, 20 and 17 points in its last five two-week sprints. The average is 20 a sprint, so the work needs 6 sprints: 12 weeks from the next sprint start.

At the best recent pace of 24, it needs 5 sprints; at the slowest, 17, it needs 8. So the likely date is 12 weeks out, with a range of 10 to 16 weeks. Telling a client "most likely the end of week 12, and no later than week 16" is a promise the team can keep.

Getting a forecast you can trust

  • Count only finished work. Half-done items in a sprint's total make the pace look faster than it is.
  • Keep the scope honest. If new work keeps joining the backlog, the remaining number grows each sprint and the date drifts. Re-run the forecast every sprint with today's remaining figure.
  • Watch for changes in the team. Leave, holidays and new joiners change the pace. The sprint capacity calculator shows how much a short-staffed sprint should shrink.
  • Use enough history, but not too much. Three to six recent sprints reflects how the team works now. A year-old sprint mostly reflects a different team.

Forecasts that update themselves

On ShipSprint's Business plan, delivery forecasts are calculated the same way from each team's measured velocity, and recalculated every time a sprint closes, so a slipping date shows up weeks before it's due instead of on the day. The owner command center shows those forecasts for every team on one screen. The 14-day trial runs on the full Business plan, with a sample project loaded and no card.

FAQ

Questions about delivery forecasts

Three to six recent sprints. Fewer gives a shaky average; many more mixes in a team that may have worked quite differently.

Your data, protected and yours.Isolated workspacesTwo-factor authenticationFull audit logExport your data anytimeRead the security overview →

Keep reading

See it on your own work.

A workspace your whole company will actually use is 60 seconds away. No card, no risk, nothing to install.

  • 14-day full-access trial
  • Sample project included
  • No card required
  • 7-day refund on paid plans

Try ShipSprint free for 14 days. No card required.

Start free trial