COMPANY SIZE

Project Management for Startups

You're already doing five jobs. The project tool shouldn't be a sixth. ShipSprint runs engineering, marketing and ops on one free plan, set up before your coffee's cold.

Nobody hired a project manager, so the system has to act like one

At a five-person startup, the same person who closed a customer this morning reviews a pull request after lunch and drafts a careers page before dinner. There's no dedicated PM, no ops hire, and no appetite to become the admin for a tool that needs one. Whatever you use has to fit how you already think, not how a training video insists it should.

Most project software is built for a department that already exists: a process, a PM, a budget line for both. A five-person team has none of that. What it has instead is one shared understanding of what's actually on fire this week, usually kept in somebody's head, which is a single point of failure wearing the costume of institutional memory.

ShipSprint's answer is to start free, not free-for-fourteen-days: five users, two projects, no expiry. That's enough room to run your actual company on it, not a demo you'll have to migrate out of the moment it proves useful.

It's also worth being honest about what a five-person team doesn't need yet. You almost certainly don't need SSO, an audit log, or a command center rolling up numbers across departments you don't have. Those exist on ShipSprint's Business plan for later, when there's enough organizational complexity to make them worth the extra spend, not because a startup should be buying reporting infrastructure for a team that still fits around one table.

Built for the founding stage

What replaces five subscriptions and a group chat

Each piece exists because a five-person team doesn't have a spare person to own it.

One workspace instead of five tools

Engineering board, marketing calendar and an ops queue live under the same login and the same bill, so switching from "build" mode to "launch" mode is a tab, not a new subscription.

Free, not a countdown

Five users, two projects, no card, no expiry date creeping toward a paywall while you're heads-down shipping.

A working board in under a minute

Sign up and there's something real to put tasks into immediately, not a twenty-minute setup wizard standing between you and the actual work.

Status without a standup

Boards carry WIP limits so nothing quietly piles up, and new requests land in a triage inbox instead of someone's DMs.

Hours logged without a timesheet

Logging a day takes about five seconds next to the task you just closed, useful the moment you start billing a client or reporting to an investor.

Answers without a meeting

ShipSprint connects to Claude and ChatGPT, so "what did we ship this week" is a question you ask, not a status doc someone writes Friday night.

What five people actually lose time to, without a system

It's rarely one big failure. It's the customer follow-up that lived in someone's head and never made it to anyone else's, so it slipped for two weeks until the customer chased it themselves. It's the investor update that takes an evening to write because the real status is scattered across three Slack channels and a doc nobody updated since the last one. It's the engineer who picked up a bug fix that a cofounder had already half-solved that morning, because there was no shared place either of them would have checked first.

None of that is a discipline problem. A five-person team genuinely cannot hold everything in shared memory once there's more than one workstream running (one person selling, one building, one keeping the lights on), even though five people sounds small enough that it should be easy. The fix isn't a heavier process; a startup doesn't have anyone to run one. It's a board that's the actual source of truth, so "what's the status" is a link, not a conversation.

Why the free plan isn't bait

A lot of "free" project tools cap out at one project or three days of history, which is a trial wearing different marketing. ShipSprint's free plan is the same product at a smaller size (five users, two projects, forever), because a startup deciding whether to build a habit around a tool shouldn't have to guess what the paid version actually does.

When you outgrow it (a sixth hire, a third initiative), Team is ₹299 per user per month, no separate onboarding fee, no migration project. You add a seat the same afternoon you make the hire. The full breakdown is on the ../../pricing.html page.

What matters before you have a process

  • A "my day" screen, so a new hire's first morning is "here's what's on you today," not a half-finished onboarding doc.
  • One tap for "I'm blocked," which pulls in the right person with context attached instead of a message that says "got a sec?"
  • A wiki that sits next to the work, so the reason you chose one database over another isn't buried in a chat thread from three months ago.
  • GitHub integration, so a branch moving a card and a merged pull request closing it is one less status update a founder-engineer has to type.
  • Delivery forecasts once you're running sprints, calculated from your own velocity rather than whatever date sounded right in the all-hands.
  • No screenshots, no keystroke logging. A founding team runs on trust, and a monitoring feature is a strange thing to install on people you hand-picked.

Speed matters more than features at this stage

A startup evaluating tools rarely has an afternoon to spend on it, let alone a week. The realistic scenario is someone hits a wall (a customer request got lost, a launch date crept up on nobody noticing), searches for a fix that evening, and either has something working before bed or gives up and goes back to the group chat. That's the actual bar: not "does it have every feature," but "can I be using it before I lose interest."

That's why ShipSprint's onboarding is a sign-up form and a sample project, not a guided call with someone asking about your org chart. There's nothing to configure before the board is usable. Templates for engineering, marketing and ops exist so you pick the closest fit and start typing tasks into it, and adjust later if it doesn't quite match how your team works. Five-person teams that go this route are usually running real sprints on ShipSprint within the same day they signed up, not somewhere in their second week. Most of what a five-person team needs from a project tool is honestly the boring 80%: a place to put tasks, a way to see what's overdue, and a log of hours that doesn't require a Friday-afternoon reconstruction. Startups rarely need the last 20% of any tool's feature list in year one.

FAQ

Common questions

Yes. Free covers 5 users and 2 projects with no time limit and no card on file. Most startups stay on it comfortably through their first several months, sometimes longer.

Keep reading

Related pages

See it on your own work.

A workspace your whole company will actually use is 60 seconds away. No card, no risk, nothing to install.

14-day full-access trial · sample project included · no card required