Project Tracking Software

Tracking one project is a spreadsheet. Tracking every project your company is running at once, without it becoming a full-time job, is the actual problem.

Tracking status one project at a time doesn't scale

Somewhere around the fourth or fifth concurrent project, the person responsible for knowing "where things stand" stops being able to hold it in their head. There's a client deliverable due Friday, an internal migration that's been "almost done" for three weeks, and a marketing launch nobody's mentioned in the last two standups. Each project has its own thread, its own spreadsheet tab, its own person who half-remembers the status.

The failure mode isn't dramatic. It's a Tuesday where three people ask the tracking owner for a status update, each gets a slightly different answer depending on which spreadsheet tab was open when they asked, and by Thursday nobody fully trusts the numbers anymore, including the person who owns them.

An agency running twelve client engagements at once feels this hardest, but it's not only agencies. A mid-sized company running a product roadmap, an internal migration and a compliance project in parallel has exactly the same problem, just with the word "client" swapped for "stakeholder." Whoever's accountable for all three ends up asking three different people the same question in three different formats, and reconciling the answers by hand.

The usual response is a weekly status meeting where every project lead reports in, or a shared spreadsheet that's accurate on the day someone last updated it and wrong every day after. Both exist because tracking, done manually, needs a human to keep chasing it, and the chasing stops being sustainable well before the number of projects does.

ShipSprint tracks status as a byproduct of the work happening, across every project a company runs, so the answer to "where are we" doesn't depend on anyone stopping to compile it.

How it works

What tracking looks like across the whole company

One system underneath every project, instead of one spreadsheet per project.

A status you don't have to ask a project lead for

Boards carry per-column WIP limits and work is planned against real capacity, so a project's actual state (not the state its lead remembers reporting last) is what shows on the board at any moment.

Forecasts for every project, not just the one someone's worried about

Delivery forecasts are calculated from each team's measured velocity as sprints complete, so a date at risk on any project surfaces weeks early, including the ones quiet enough that nobody's been watching closely.

One inbox for requests, instead of five per project

New requests land in a triage inbox instead of scattering across someone's messages, which matters more once there are several projects each generating their own stream of asks.

A single screen across every project you're running

The owner command center answers "where are we?" across every team and project at once, and a digest lands Monday morning without anyone assembling it from five separate updates.

Hours that tell you what a project actually costs

Logging a day's hours takes about five seconds and sits next to the task just finished, so time spent on a project is data you already have rather than something reconstructed at invoicing time.

A record of why a project's plan changed

The built-in wiki keeps decisions next to the project they affect, with page history. That's useful when a client or a colleague asks, four months later, why the scope moved.

The forecast is the point

Most project tracking answers "what's the status today." The more useful question is "will this land on time," and that one requires more than a percentage-complete field someone updated by feel.

ShipSprint's forecasts come from a team's measured velocity (how much they've actually delivered per sprint) projected forward against what's left. That number gets better as a project runs, not worse, because it's built from real throughput rather than an estimate made in week one. A project sliding off track shows up as a shifted date weeks before the deadline, while there's still enough runway to move scope or add help.

Consider a team that's historically delivered around eighteen story points a sprint. A project scoped at ninety points, with six sprints left on the calendar, needs fifteen points a sprint to land on time. That's a gap the forecast surfaces the moment the velocity data makes it visible, rather than at the retro three weeks before the deadline, when there's no sprint left to fix it in.

Tracked across every project at once, this is what turns "where are we" from a meeting into a screen you can check before deciding whether that meeting needs to happen at all. Companies running a dozen projects on ShipSprint tend to say the same thing: the number of status meetings drops first, before anyone even notices the forecasts got more accurate.

It also changes what "at risk" means in practice. A status field that says "on track" right up until the day it doesn't is not a warning system, it's a lagging indicator dressed up as a live one. A forecast built from actual sprint throughput moves gradually as reality changes, which is what makes it something you can act on rather than something you find out too late to use.

A record that holds up when someone asks later

Every workspace is an isolated tenant, two-factor authentication is available to every user, and every admin action (who changed a deadline, who reassigned a project, who exported a report) is written to an audit log. For tracking specifically, that audit trail is often the actual answer to "why does the record show this," not just a compliance checkbox.

The whole workspace also exports as JSON at any time, so the tracking record isn't trapped in a dashboard that only makes sense while the subscription is active. A company can pull its own project history whenever it needs to. That same audit trail is useful day to day too: when a deadline moves and someone wants to know whether it moved because of scope or because of a delay, the answer doesn't depend on anyone's memory of a conversation from three weeks ago.

Reporting upward without building a deck

Somebody eventually has to tell the board, the founder, or a client account lead where things stand. That report is usually assembled by hand: pull screenshots from three tools, phrase the same risk five different ways depending on the audience, spend two hours doing what a status meeting was already supposed to have covered.

The owner command center is built from the same data those reports draw on, already assembled: every project, every team, one screen. The Monday digest covers the version most people actually need: what shipped, what's at risk, what changed since last week, without anyone opening a slide template to produce it.

For a company answering to a client rather than a board, the same forecast that flags an internal risk early is also the honest version of "are we on track" worth sharing before the client asks. That reads very differently than a status update that only appears once something has already gone wrong.

Tracking without the surveillance angle

Because tracking involves numbers attached to people's names, it's worth being explicit: ShipSprint takes no screenshots, logs no keystrokes and tracks no activity. What it tracks is work: items delivered, hours logged by the person who logged them, where a project is stuck. Every person can see their own scorecard, adjusted for leave, whenever they want. Project tracking and staff monitoring aren't the same category of software, and conflating them is how a tracking tool loses the cooperation of the people it needs data from.

ShipSprint also connects to Claude and ChatGPT, so a question like "which of our projects is most likely to slip this month" can be asked directly of the workspace, in plain language, instead of pulled together from five status docs.

What it costs to track everything in one place

Pricing scales with people, not with the number of projects you're tracking.

  • Free covers up to 5 users and 2 projects, permanently.
  • Team is ₹299/user/month (₹2,899/year), up to 40 users, with every project on the same board and billing.
  • Business is ₹599/user/month (₹6,499/year) and removes the project cap entirely, adding forecasts, scorecards and the owner command center: the tier most companies tracking more than a handful of projects land on.
  • Every paid plan starts with a 14-day full-access trial on Business, with a sample project preloaded and no card required.

Full details on pricing.

FAQ

Common questions

Business removes the project cap, and the owner command center is built for exactly this: one screen across every team and project, rather than a separate report per project.

Keep reading

Related pages

See it on your own work.

A workspace your whole company will actually use is 60 seconds away. No card, no risk, nothing to install.

14-day full-access trial · sample project included · no card required