Project Management Software for Technology Teams in Chennai
Chennai builds cars and writes software in the same metro area, on schedules that do not forgive each other, and ShipSprint is priced and billed for the reality of both.
A city where a missed deadline can stop a production line
Chennai's economy carries a weight most tech-hub cities don't: a large automotive and auto-components manufacturing base, alongside the IT services corridor along OMR and the older cluster around Guindy. Those two worlds have very different tolerances for slippage. A software sprint that runs two days over is annoying. A supplier delivery that runs two days over can idle an assembly line, and the cost of that shows up the same day, not at the next retrospective.
That difference in stakes tends to get lost in generic project software, which treats every task the same regardless of what happens downstream if it's late. A vendor coordination task tied to a production schedule deserves the same visibility as a sprint item, arguably more, and most tools bury it in the same undifferentiated list.
The other recurring cost is simpler: dollar-denominated pricing. A per-seat rate that looks reasonable converted from USD moves against you every time the rupee does, on a renewal date you don't control.
ShipSprint prices in rupees from day one, invoices with GST, and treats WIP limits and capacity planning as tools for exactly the kind of schedule risk a manufacturing-adjacent business actually carries.
Vendor coordination is a project too
A lot of what makes Chennai manufacturing work happen is coordination between an OEM, its tier-one and tier-two suppliers, and an internal engineering team, and that coordination rarely lives cleanly inside one company's tool. ShipSprint's triage inbox gives incoming requests, whether from a supplier, a client, or another internal team, a landing spot that isn't someone's personal messages, so a request doesn't quietly become a person's problem to remember.
Per-column WIP limits do something specific here: they stop a team from quietly accepting more in-flight work than its real capacity, which is exactly how a manufacturing-adjacent delivery starts slipping without anyone noticing until the date arrives. And because delivery forecasts are built from the team's own measured pace rather than an optimistic estimate typed in at planning time, a date drifting into risk shows up weeks out, while there's still time to do something about it.
One subscription for engineering, and everyone around it
A manufacturing or IT services business in Chennai rarely runs on engineering alone.
Sprints, releases and cycle-time analytics for the software side, with GitHub branches moving cards and merged pull requests closing them automatically.
A candidate pipeline and onboarding checklist that runs on the same board logic as delivery work, useful when hiring for both engineering and shop-floor coordination roles.
Vendor queues, procurement follow-ups and recurring compliance tasks, tracked with the same rigor as a sprint, in language that fits operations rather than software.
A single command center across engineering, operations and every supplier-facing team, with a Monday digest that arrives without anyone building it by hand.
Everyone opens to the same screen, whichever floor they're on
Someone who spent the morning walking a supplier through a spec change and someone who spent it closing a sprint ticket both open ShipSprint to the same "my day" screen: today's items, a time log that takes about five seconds, and one tap to say "I'm blocked", which pulls in the right person with context already attached instead of waiting for the next meeting to surface it.
That shared starting point matters in a company that spans engineering and manufacturing coordination, because the two teams rarely think about work the same way. A vendor delivery milestone looks nothing like a sprint ticket on the board, but the underlying habit of logging it, flagging it and moving it stays identical across both.
Spread between Guindy, OMR, and a plant floor
A Chennai team rarely sits under one roof. Engineering may run out of the OMR corridor, a manufacturing liaison might be near Guindy or further out toward the industrial belt, and increasingly a chunk of the team works from home on any given day. Status meetings are the usual fix for that spread, and they're an expensive one when half the room is dialing in.
ShipSprint removes the need for most of them by making status a byproduct of the work itself: a card's position on the board is the status, a blocker gets raised in one tap and lands with the right person and its context attached, and capacity accounts for approved leave so nobody gets assigned a delivery on a day they're not actually there.
It also connects to Claude and ChatGPT, so questions like "what's blocking the supplier handoff?" can be answered in plain language rather than a call that pulls people off the floor.
What the chaos costs, worked out in rupees
Run the arithmetic on your own numbers rather than a vendor's:
people × hours lost per week × 4.33 weeks × (monthly salary ÷ 173 working hours)
A twenty-five person team on an average monthly salary of ₹55,000, losing three and a half hours each per week to status chasing, vendor follow-ups repeated over email, and reconstructing what actually shipped, is losing roughly ₹1,20,000 a month. The same twenty-five people cost ₹14,975 a month on Business. You don't need to recover all of that lost time for the trade to make sense; a fraction of it already pays for the subscription. The calculator on the home page runs the same formula on your own figures.
Templates that fit an OEM's world, not just a startup's
Most project software ships with defaults built around a product startup, and everything else has to be bent into that shape. Chennai's business mix is different enough that the bending shows: a quality checklist for a supplier audit has almost nothing in common with a sprint retrospective, and forcing both into identical templates usually means one of them gets used badly. Engineering, HR, marketing and operations each get their own templates and vocabulary inside the same ShipSprint subscription, so a plant-facing operations team isn't stuck relabeling sprint fields to mean something they were never designed to mean.
Your data, and the law it sits under
Every workspace is an isolated tenant, two-factor authentication is available to every user, and every administrative action is logged. You can export the whole workspace as JSON at any point, no need to ask.
ShipSprint is built by Quantuva Technologies Pvt. Ltd., registered in Hyderabad, so support, billing and contracts sit under Indian law and inside Indian business hours, not routed through an overseas queue that opens after your day ends. The security overview has the detail, and the sub-processor list names every third party involved.
Questions from Chennai teams
Yes, billing is in rupees with GST-compliant invoices, and annual billing is available. Quoted prices exclude applicable taxes.
No. Engineering gets the deepest tooling, but manufacturing-adjacent teams tend to lean on the triage inbox and WIP limits for vendor and supplier coordination, while HR, marketing and operations run on the same subscription with their own templates.
No. There are no screenshots, no keystroke logging and no activity tracking, only work outcomes: delivered items and hours the person logs themselves. Scorecards are leave-adjusted and visible to the person they describe, not to everyone.
Free covers up to five users and two projects, permanently. Team is ₹299 per user per month, or ₹2,899 per year, up to 40 users. Business is ₹599 per user per month, or ₹6,499 per year, and adds forecasts, scorecards and the owner command center. Full detail is on the pricing page.
Related pages
See it on your own work.
A workspace your whole company will actually use is 60 seconds away. No card, no risk, nothing to install.
14-day full-access trial · sample project included · no card required