Project Management Software for Software Development Teams in Munich
Munich's engineering culture measures tolerances in millimetres, and its software teams tend to expect the same precision from their own delivery numbers. ShipSprint's burndown comes from GitHub merge history, not an optimistic status update.
A burndown chart that wouldn't survive review, next to a culture that reviews everything
Munich is headquarters territory for engineering and industrial names whose reputation rests on precision, and that expectation reaches software teams too, even ones with no direct connection to a production line. What rarely gets the same scrutiny is the sprint board itself, which fails the same way everywhere: an engineer finishes a task, moves to the next one, and the card sits in "in progress" because dragging it across a column wasn't the priority.
A burndown chart built on that kind of lag is, in effect, an opinion dressed up as a schedule, and the kind of engineering culture Munich is known for tends to treat that gap as a real quality problem, not a rounding error, once someone actually notices it.
ShipSprint closes the gap automatically instead of asking for more discipline. A branch tied to a card advances it the moment work starts. A merged pull request closes it. Burndown and cycle-time analytics build themselves from that merge history, so the numbers a review scrutinizes are already built from real activity, not filled in by hand.
Built around merge history, not memory
Numbers that hold up to the same scrutiny a Munich engineering review applies to everything else.
Open a branch tied to a card and it advances on the board automatically, no drag required to reflect that work has started.
A merged pull request closes its card on its own, so "done" on the board means the code actually shipped.
Burndown and cycle-time analytics are calculated from actual merge history, no manual board updates required.
Per-column WIP limits stop a column from filling up before a team is quietly overcommitted, with capacity that's actually measured, not assumed.
The forecast improves as more real data accumulates, sprint after sprint, rather than staying pinned to an initial estimate.
A sprint review that doesn't start with "let me check"
A structured sprint review has no room for someone spending its opening minutes reconciling the board against the repo, and a Munich review, where leadership wants an early warning on a slipping date, not a status report that confirms what already went wrong, has even less patience for it. When the board takes its state from GitHub directly, that reconciliation step is gone before the meeting starts.
A built-in wiki keeps design decisions and technical rationale attached to the project they belong to, with full page history, so a reviewer six months later can see not just what was decided but why. Any sentence on a wiki page can become a task directly, without copying it elsewhere first.
ShipSprint is built by Quantuva Technologies Pvt. Ltd., a company registered in India, with no Munich or German entity. Billing is in rupees; talk to your finance team about the exchange rate and how VAT applies, since Quantuva does not issue EU VAT invoices.
Questions from Munich dev teams
From completed work in past sprints, specifically merged pull requests tied to cards, not from initial estimates. As each sprint closes, the forecast updates against what the team actually delivered, so the number gets more reliable the longer a team has been using it, rather than staying anchored to a guess made in week one.
No. The contracting entity is Quantuva Technologies Pvt. Ltd., registered in India. There's no German subsidiary, and billing is handled in rupees rather than euros.
Yes. Every column carries its own limit, so a stage of the workflow can't silently fill up beyond what the team can actually process, whatever the overall board size looks like.
Free covers up to 5 users and 2 projects. Team is ₹299 per user per month for up to 40 users. Business is ₹599 and adds forecasting, leave-adjusted scorecards, the owner command center and SSO. Details are on the pricing page.